• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Simulated time for testing railway interlockings with TTCN-3
 
  • Details
  • Full
Options
2006
Conference Paper
Title

Simulated time for testing railway interlockings with TTCN-3

Abstract
Railway control systems are timed and safety-critical. Testing these systems is a key issue. Prior to system testing, the software of a railway control system is tested separately from the hardware. Here we show that real time and scaled time semantics are inefficient for testing this software. We provide a time semantics with simulated time and show that this semantics is more suitable for testing of software of railway control systems. TTCN-3 is a standardized language for specifying and executing test suites. It supports real time and scaled time but not simulated time. We provide a solution that allows simulated time testing with TTCN-3. Our solution is based on Dijkstra's distributed termination detection algorithm. The solution is implemented and can be reused for simulated time testing of other systems with similar characteristics.
Author(s)
Blom, S.
Ioustinova, N.
Pol, J. van de
Rennoch, A.
Sidorova, N.
Mainwork
Formal approaches to software testing. 5th international workshop, FATES 2005  
Conference
International Workshop on Formal Approaches to Testing of Software (FATES) 2005  
Open Access
DOI
10.1007/11759744_1
Language
English
Fraunhofer-Institut für Offene Kommunikationssysteme FOKUS  
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024