• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. A modified shifting bottleneck heuristic for scheduling wafer fabrication facilities
 
  • Details
  • Full
Options
2002
Conference Paper
Title

A modified shifting bottleneck heuristic for scheduling wafer fabrication facilities

Abstract
The Factory Operations portion of the 2001 International Technology Roadmap for Semiconductors (ITRS) indicates that real time scheduling is one of the potential solutions for the semiconductor industry to preserve the decades-long trend of 30% per year reduction in cost per function. However, scheduling wafer fabrication facilities is a very difficult problem. There are several main features that complicate scheduling these systems including: a large number of processing steps, re-entrant flows, batch tools, planned and unplanned equipment downtimes, sequence-dependent tool setups, high levels of automation, and the fact that some processing steps require auxiliary resources (e.g. reticles). The Semiconductor Research Corporation (SRC) and International SEMATECH recently created the Factory Operations Research Center (FORCe). As one of the initial set of FORCe projects, a team of researchers from two US and three German institutions were funded to investugate a shifting bottleneck heuristic-based approach to scheduling wafer fabrication facilities. In this paper, we briefly describe the FORCe program and discuss the four major research tasks associated with the three year scheduling project.
Author(s)
Fowler, J.W.
Brown, S.
Carlyle, W.M.
Gel, E.S.
Mason, S.J.
Mönch, L.
Rose, O.
Runger, G.C.
Sturm, R.
Mainwork
12th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM 2002. Proceedings  
Conference
International Conference on Flexible Automation and Intelligent Manufacturing (FAIM) 2002  
Language
English
Fraunhofer-Institut für Produktionstechnik und Automatisierung IPA  
Keyword(s)
  • wafer fabrication

  • scheduling

  • SEMATECH

  • Fertigung

  • Halbleiter

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024