Options
Fraunhofer-Institut für Produktionsanlagen und Konstruktionstechnik IPK
Now showing
1 - 10 of 29
-
PublicationDesign principles for strengthening international cooperation in R&D( 2002)
;Albrecht, R. ;Kohl, H.Finke, I. -
-
PublicationHigh sequence keeping rates through decentralised scheduling in automotive industries( 1997)
;Mertins, K. ;Albrecht, R.Beck, S. -
PublicationApplication of customer/supplier relations on decentralized short term production planning and control in automotive industries( 1996)
;Mertins, K. ;Albrecht, R. ;Bahns, O. ;Beck, S.LaPierre, B. -
PublicationTest and evaluation of factory control concepts by integrated simulation( 1996)
;Mertins, K. ;Albrecht, R. ;Rabe, M.Rieger, P. -
PublicationDimensionierung von KANBAN-Regelkreisen( 1996)
;Mertins, K. ;Albrecht, R. ;Lewandrowski, U.Hortmann, H. -
PublicationZiehende Produktionssteuerung für asiatischen Automobilbauer( 1996)
;Mertins, K. ;Albrecht, R.Sauer, O. -
PublicationPull-oriented synchronization of logistics and production flow in automobile industries( 1996)
;Mertins, K. ;Albrecht, R. ;Bahns, O. ;Beck, S.Krause, O. -
PublicationKorea. Hyundais neues Fabrikkonzept. Keine Bindung an den Kundenauftrag( 1996)
;Mertins, K. ;Albrecht, R. ;Sauer, O.Bahns, O. -
PublicationConstraint production management using Fuzzy Control( 1995)
;Mertins, K. ;Albrecht, R.Duttenhofer, F.The functions of short-time planning and control of orders on the factory's shop floor can be supported by Production Management Systems. A scheduling system capable of reflecting the planning staff's experience has been implemented. Due to the complexity of the scheduling problem and the typical lack of precision in shop expert's planning strategy descriptions a system was designed based on Fuzzy Logic. The article presents concepts, theory and implementation of a Fuzzy Logic scheduling system for an aluminium foundry and mill.
- «
- 1 (current)
- 2
- 3
- »