Shen, C.C.ShenKaufmann, P.P.KaufmannHachmann, C.C.HachmannBraun, MartinMartinBraun2023-10-172023-10-172018https://publica.fraunhofer.de/handle/publica/25479710.1016/j.ijepes.2017.07.007This is a study of a combined load restoration and generator start-up procedure. The procedure is structured into three stages according to the power system status and the goal of load restoration. Moreover, for each load restoration stage, the proposed algorithm determines a load restoration sequence by considering renewable energy such as solar and wind park to achieve objective functions. The validity and performance of the proposed algorithm is demonstrated through simulations using IEEE-39 network.enThree-stage power system restoration methodology considering renewable energiesjournal article