Options
2025
Conference Paper
Title
Repairing Schedules by Removing Waiting Times: A Parameterized Complexity Analysis
Abstract
We consider the problem of repairing production schedules in a job-shop setting by reducing pre-planned waiting times. Herein, a schedule of all jobs is given. To compensate unforeseen disturbances, this schedule contains waiting times between the execution of two consecutive tasks of a job. Further, we assume that the schedule temporarily overloads some machines, e.g. due to reduced machine capacities because of worker sickness or (partially) broken machines. We study the problem of removing as few waiting times as possible in order to eliminate the machine overloads. After formalizing this problem, we perform an extensive analysis of its parameterized complexity with respect to several natural parameters, resulting in a detailed picture of the problem’s complexity.
Author(s)
Open Access
File(s)
Rights
CC BY 4.0: Creative Commons Attribution
Language
English