• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Interdependencies between energy productivity and target figures of lean production systems
 
  • Details
  • Full
Options
2013
Conference Paper
Title

Interdependencies between energy productivity and target figures of lean production systems

Other Title
Wechselwirkungen zwischen Energieproduktivität und Zielgrößen ganzheitlicher Produktionssysteme
Abstract
Energy productivity will be a significant competitive advantage for manufacturing companies in future. Therefore, a methodical approach is necessary to identify potential in manufacturing and reduce energy waste. In order to develop this approach, it is obligatory to consider interdependencies to established production systems. Starting with Toyota, car manufacturers were pioneers for the implementation of Lean Production Systems (LPS). Their production processes are measured by LPS target figures like quality or through-put time. Efforts to raise energy productivity can cause impacts on existing production processes and therefore result in interdependencies with LPS target figures. The methodology presented in this paper helps to increase energy productivity under consideration of these interdependencies. The so called House of Energy Productivity is introduced as one important part of the methodology.
Author(s)
Schnellbach, Peter
Reinhart, Gunther  
Mainwork
11th Global Conference on Sustainable Manufacturing, GCSM 2013  
Conference
Global Conference on Sustainable Manufacturing (GCSM) 2013  
Language
English
Fraunhofer-Institut für Werkzeugmaschinen und Umformtechnik IWU  
Keyword(s)
  • lean production

  • energy productivity

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024