• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Artikel
  4. The Time Synchronization Problem in data-intense Manufacturing
 
  • Details
  • Full
Options
2022
Journal Article
Title

The Time Synchronization Problem in data-intense Manufacturing

Abstract
Modern production systems rely heavily on data from the machines, processes and other sources. The amount and resolution of the data increases continuously allowing complex models like Machine Learning models to be trained and applied in production. All analytics and models that rely on the production data implicitly require a suitable data quality. Central level of data generation and acquisition is the machine level where data from machine and sensors are generated and need to be aggregated. In this paper, we define the Time Synchronization Problem that arise from the different data sources and technical properties of computerized systems in manufacturing directly impacting the quality of Time-Series data. Further, we cluster current approaches and discuss their applicability in data-intense manufacturing.
Author(s)
Schmetz, Arno
Fraunhofer-Institut für Produktionstechnologie IPT  
Lee, Tae Hun  
Fraunhofer-Institut für Produktionstechnologie IPT  
Zontar, Daniel  
Fraunhofer-Institut für Produktionstechnologie IPT  
Brecher, Christian  
Fraunhofer-Institut für Produktionstechnologie IPT  
Journal
Procedia CIRP  
Project(s)
Leistungszentrum Vernetzte, Adaptive Produktion
Funder
Bundesministerium für Bildung und Forschung  
Conference
Conference on Manufacturing Systems 2022  
Open Access
DOI
10.1016/j.procir.2022.05.070
Additional link
Full text
Language
English
Fraunhofer-Einrichtung Forschungsfertigung Batteriezelle FFB  
Fraunhofer-Institut für Produktionstechnologie IPT  
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024