• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Lot release planning for customer oriented manufacturing
 
  • Details
  • Full
Options
2004
Conference Paper
Title

Lot release planning for customer oriented manufacturing

Other Title
Losfreigabe für eine kundenorientierte Produktion in der Halbleiterfertigung
Abstract
Planning in semiconductor plants tries to optimize throughput and minimize WIP. On the other hand, there is a strong need for high delivery performance. Meeting the promised due dates becomes more and more a hard requirement. Therefore, we developed a planning methodology that tries to balance the needs of the fab and the needs of the markets. A rought, capacity basket model based approach for CTP and a linked simulation model for lot release planning based on the results of rough planning.
Author(s)
Löffler, B.
Mainwork
Factory logistics in cleanroom manufacturing, material flow, material scheduling and automation  
Conference
Factory Logistics in Cleanroom Manufacturing, Material Flow, Material Scheduling and Automation 2004  
Fraunhofer-Institut für Produktionstechnik und Automatisierung (Workshop) 2004  
Language
English
Fraunhofer-Institut für Produktionstechnik und Automatisierung IPA  
Keyword(s)
  • APS

  • Halbleiterfertigung

  • semiconductor

  • lot release planning

  • Kundenorientierung

  • Halbleiter

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024