• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Artikel
  4. Simulation based validation of supply chain effects through ICT enabled real-time-capability in ETO production planning
 
  • Details
  • Full
Options
2017
Journal Article
Title

Simulation based validation of supply chain effects through ICT enabled real-time-capability in ETO production planning

Abstract
According to Industry 4.0, real-time information in production planning and control, shows a high potential for optimizing the whole supply chain. The paper considers the plant building industry, especially the off-site fabrication and on-site installation. Traditionally, production planning is centralized following a Master Schedule that rarely is up to date, ignoring deviations on-site. As a result, components are delivered in advance or too late, which create non-value adding activities and high inventory levels. The paper proposes an ICT-supported nearly real-time capable production planning approach, which by means of a simulation, shows a drastically reduction of the inventory level on-site.
Author(s)
Dallasega, P.
Rojas, R.A.
Rauch, E.
Matt, D.T.
Journal
Procedia manufacturing  
Conference
International Conference on Flexible Automation and Intelligent Manufacturing (FAIM) 2017  
Open Access
DOI
10.1016/j.promfg.2017.07.187
Additional link
Full text
Language
English
Italia  
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024