• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Artikel
  4. Planning assistance for pearl chain forecasts and personnel assignment planning of sequenced assembly lines
 
  • Details
  • Full
Options
2011
Journal Article
Title

Planning assistance for pearl chain forecasts and personnel assignment planning of sequenced assembly lines

Abstract
In sequenced automobile assembly, the assignment of personnel is done at almost all major manufacturers subordinate to the sequencing, resulting in sub-optimal utilization of personnel resources. By integrating the sequence planning with the personnel assignment planning, a significant increase in hours-per-vehicle efficiencies is possible. The presented integrated planning approach combines a sequencing solution based on constraint programming, with incident-discrete simulation. The hybridsolution evaluates the sequence-building regarding personnel and procedural restrictions with the intent of simultaneously optimizing the vehicle sequence and the deployed assembly personnel, resulting in lower capacity demand fluctuations and increased utilization of personnel resources.
Author(s)
Mayrhofer, Walter
Fraunhofer Austria Research  
März, Lothar
Fraunhofer Austria Research  
Sihn, Wilfried
Fraunhofer Austria Research  
Journal
CIRP Annals. Manufacturing Technology  
DOI
10.1016/j.cirp.2011.03.044
Language
English
Fraunhofer AUSTRIA  
Keyword(s)
  • sequencing

  • production planning

  • productivity

  • Produktionsplanungssystem

  • Produktivitätsmanagement

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024