• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Optimization of tasks scheduling in cooperative robotics manufacturing via Johnson's algorithm case study
 
  • Details
  • Full
Options
2017
Conference Paper
Title

Optimization of tasks scheduling in cooperative robotics manufacturing via Johnson's algorithm case study

Title Supplement
One collaborative robot in cooperation with two workers
Abstract
The rapid development of information technology in the last half century led to the emergence of a new industrial revolution, often called Industry 4.0, the key element of which is the introduction of informatization in all spheres of human life and the widespread use of cyberphysical systems. The main attribute of such systems is the interaction of human and smart machines, this approach allows achieving the greatest flexibility and productivity simultaneously. The latest example of such systems is the collaborative manufacturing system, where the human worker cooperates in a close distance with a collaborative robot (cobot) in a production scenario. This cooperation is applicable when the final product requires a high degree of customization that a worker can provide, while cooperation with the cobot is greatly speeding up the productivity. In this context, one of the actual problems is to schedule the cooperative tasks in real time among the operational resources (i.e., the workers and cobots). This problem can be reduced to a special case of the flow-shop scheduling problem. The complexity of this problem increases with increasing the number of cooperative operational resources and the production steps. Undoubtedly, modern production often involves several processing steps serviced by several operational resources. Therefore, it is necessary to study a complex cooperative manufacturing scenario. The simplest and most understandable case scenario is the interaction of two workers and one cobot in two stages production workcell. Thus, in this paper we will consider the implementation of this casestudy using the available scheduling algorithms.
Author(s)
Sadik, Ahmed R.
Fraunhofer-Institut für Graphische Datenverarbeitung IGD  
Taramov, Andrei
Fraunhofer-Institut für Graphische Datenverarbeitung IGD  
Urban, Bodo  
Fraunhofer-Institut für Graphische Datenverarbeitung IGD  
Mainwork
IEEE Conference on Systems, Process and Control, ICSPC 2017. Proceedings  
Conference
Conference on Systems, Process and Control (ICSPC) 2017  
DOI
10.1109/SPC.2017.8313018
Language
English
Fraunhofer-Institut für Graphische Datenverarbeitung IGD  
Keyword(s)
  • Collaborative robotics (COBOT)

  • Holonic control architecture

  • multi agent system

  • Flow shop scheduling

  • Lead Topic: Digitized Work

  • Research Line: Human computer interaction (HCI)

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024