• English
  • Deutsch
  • Log In
    Password Login
    or
  • Research Outputs
  • Projects
  • Researchers
  • Institutes
  • Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Artikel
  4. A note on minimizing the sum of squares of machine completion times on two identical parallel machines
 
  • Details
  • Full
Options
2017
Journal Article
Titel

A note on minimizing the sum of squares of machine completion times on two identical parallel machines

Abstract
In this short note, we address the coherence between minimizing the sum of squares of machine completion times and minimizing makespan on two identical parallel machines. We show equivalence of the two objectives and identify interesting and useful relations which allow us to transfer worst-case ratios of approximation algorithms from one problem to the other.
Author(s)
Walter, R.
Zeitschrift
Central European journal of operations research : CEJOR
Thumbnail Image
DOI
10.1007/s10100-015-0429-0
Language
English
google-scholar
Fraunhofer-Institut für Techno- und Wirtschaftsmathematik ITWM
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Send Feedback
© 2022