• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Optimizing the grid connection of Hybrid PV and wind power plants
 
  • Details
  • Full
Options
2019
Conference Paper
Title

Optimizing the grid connection of Hybrid PV and wind power plants

Abstract
In order to economically optimize the grid connection of a hybrid renewable power plant consisting of photovoltaic (PV) generation and wind turbines, the simultaneity of production from both energy sources should be taken into account. In this work, high-resolution feed-in data from such a hybrid power plant was recorded and evaluated. The results allow for an estimation of maximum energy curtailment in case of an undersized point of common coupling (PCC). Additionally, it is shown how the ratio between the PV and the wind part of a hybrid power plant influences the required dimensioning of the PCC for determined accepted levels of energy curtailment. Finally, a cost comparison for a specific curtailment scenario is performed, demonstrating that it can be economically beneficial to accept curtailment in exchange for a reduced transformer size.
Author(s)
Grab, R.
Staiger, A.
Rogalla, S.
Mainwork
SWC 2019 / SHC 2019, ISES Solar World Congress 2019, IEA SHC International Conference on Solar Heating and Cooling for Buildings and Industry 2019  
Conference
Solar World Congress (SWC) 2019  
International Conference on Solar Heating and Cooling for Buildings and Industry (SHC) 2019  
DOI
10.18086/swc.2019.19.05
Language
English
FCR-CSET  
Fraunhofer-Institut für Solare Energiesysteme ISE  
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024