• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Long term European field tests for microgrids
 
  • Details
  • Full
Options
2007
Conference Paper
Title

Long term European field tests for microgrids

Abstract
Integrating a large number of renewable and distributed energy resources requires an active interaction between generators and loads. In the recent years, several pilot installations have been realized which demonstrate different concepts for energy management in low voltage distribution grids. This paper describes selected pilot installations, where long term field tests on microgrids have been performed in low voltage grid segments: Kythnos island, Greece; "Am Steinweg" estate, Stutensee, Germany; Mannheim-Wallstadt, Germany. Goals of these pilot installations are to validate three representative approaches for energy management: Island with no connection to a feeder; Interconnected grid segment, centrally dispatched; Interconnected grid segment, focus on customer integration. Long term tests focus on the reliable contribution of DER to energy supply. As a result, all concepts have proven reliable and suitable for further long term application. The results will play a role in the development of grid connection requirements.
Author(s)
Buchholz, B.
Erge, Thomas  
Hatziargyriou, N.
Mainwork
Power Conversion Conference, PCC '07. Vol.2  
Conference
Power Conversion Conference PPC 2007  
Open Access
DOI
10.1109/PCCON.2007.373033
Additional link
Full text
Language
English
Fraunhofer-Institut für Solare Energiesysteme ISE  
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024