• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Explaining the Cost of European Space and Military Projects
 
  • Details
  • Full
Options
1999
Conference Paper
Title

Explaining the Cost of European Space and Military Projects

Abstract
There has been much controversy in the literature on several issues underlying the construction of parametric software development cost models. For example, it has been argued whether (dis)economies of scale exist in software production, what functional form should be assumed between effort and product size, whether COCOMO factors were useful, and whether the COCOMO factors are independent. Answers to such questions should help software organizations define suitable data collection programs and well-specified cost models. The only way to address these issues and obtain a generalizable conclusion is to investigate them on a large number of consistent data sets. In this paper we use a data set collected by the European Space Agency to perform such an investigation. To ensure a certain degree of consistency in our data, we focus our analysis on a set of space and military projects that represent an important application domain and the largest subset in the database. These projects have be en performed, however, by a variety of organizations. First, our results indicate that two functional forms are plausible between effort and product size: linear and log-linear. This also means that different project subpopulations are likely to follow different functional forms. Second, besides product size, the strongest factor influencing cost appears to be team size. Larger teams result in substantially lower productivity, which is interesting considering this attribute is rarely collected in software engineering cost data bases. Third, although some COCOMO factors appear to be useful and significant covariates, they play a minor role in explaining project effort. Overall, the most plausible model appears to be a log-linear model involving KLOC, team size, and a principal component influenced by three COCOMO factors: reliability requirements (RELY), storage constraints (STOR), and execution time constraints (TIME). High values for these factors are likely to be associated with emb e dded systems, which usually share these characteristics.
Author(s)
Briand, L.C.
Emam, K. el
Wieczorek, I.
Mainwork
International Conference on Software Engineering 1999. Proceedings. Preparing for the software century  
Conference
International Conference on Software Engineering (ICSE) 1999  
Open Access
DOI
10.1145/302405.302645
Additional link
Full text
Language
English
Fraunhofer-Institut für Experimentelles Software Engineering IESE  
Keyword(s)
  • economies of scale

  • model specification

  • software cost estimation

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024