• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Artikel
  4. Increasing productivity methodically in production-logistic processes
 
  • Details
  • Full
Options
2011
Journal Article
Title

Increasing productivity methodically in production-logistic processes

Abstract
The introduced methodical approach connects Value Stream Mapping (VSM) and Methods-Time Measurement (MTM) and offers new distinct advantages to reduce lead time and increase productivity based on lean principles and standardised processes. The mutually aligned design and improvement of assembly and (production) logistic processes takes either the workplaces, their surroundings and the supply areas as weIl as the overall value chain into account. The identification and exploitation of productivity potentials is realised by the joint application of VSM and MTM focussing the (work) methods, the performance and the utilisation of the processes (the dimensions of productivity). Principles, benefits and the procedure of application are described in the paper. A practical example highlights the redesign of assembly workplaces and the redesign of (production) logistic processes to reduce inventory/lead time using logistical and ergonomic aspects specially applying MTM logistic process elements.
Author(s)
Kuhlang, Peter
Fraunhofer Austria Research  
Edtmayr, Thomas
Fraunhofer Austria Research  
Sihn, Wilfried
Fraunhofer Austria Research  
Journal
International journal of agile manufacturing  
Language
English
Fraunhofer AUSTRIA  
Keyword(s)
  • MTM

  • lead time reduction

  • Value Stream Mapping (VSM)

  • ergonomic

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024