• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Artikel
  4. Integrated material requirement and capacity planning for flow-shop production
 
  • Details
  • Full
Options
1989
Journal Article
Title

Integrated material requirement and capacity planning for flow-shop production

Abstract
Production planning and control systems do not support the objectives of short lead times and low holding costs efficiently. Applied in flow-shop production, the disadvantages multiply. Therefore for flow-shop production, a specific PPC system is proposed that respects these objectives. The high efficiency of the system results from a system design that uses very precise system and graph models of the real production process which is to be planned and controlled. The combination of these models leads to the complete solution of the multistage problem. The given approach covers the scope of medium range in a hierarchical production planning system.
Author(s)
Warnecke, H.-J.
Dangelmaier, W.
Kühnle, H.
Journal
Manufacturing systems  
Language
English
Fraunhofer-Institut für Produktionstechnik und Automatisierung IPA  
Keyword(s)
  • control system

  • Fertigungsplanung

  • Fertigungssteuerung

  • JIT-Planung

  • just-in-time

  • planning

  • PPC system

  • PPS

  • production control

  • production planning

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024