Schröder, G.G.Schröder2022-03-082022-03-081988https://publica.fraunhofer.de/handle/publica/314751At the Fraunhofer-Institut in Dortmund a simulation system has been developed by which the exact daily planning for shop production is managed. With the help of heuristics it is possible to minimize production costs under the restriction of in due time delivered orders. The quality of the plan created is evaluated by means of characteristic as to production costs and in-due-time deliveries.enorder sequencingproduction planningschedulingshop productionsimulation658Application of simulation for the plannng of order sequencing in shop productionconference paper