• English
  • Deutsch
  • Log In
    or
  • Research Outputs
  • Projects
  • Researchers
  • Institutes
  • Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. Order management for semiconductor manufacturing - a new approach realized with artificial neural networks
 
  • Details
  • Full
Options
2000
Conference Paper
Titel

Order management for semiconductor manufacturing - a new approach realized with artificial neural networks

Alternative
Auftragsbearbeitung mit künstlichen Neuronalen Netzen für die Halbleiterfertigung
Abstract
Turbulent markets have led to changes in the manufacturing area which paved the way for new concepts and planning approaches. The paper deals with a planning problem which is specific to the semiconductor industry. The conventional planning procedure according to which resources are planned with constant lead times for given planning periods presents a real dilemma for semiconductor manufacturer. One way out of this dilemma is the use of rough planning methods with variable lead times. This article describes such a procedure based on an interative planning concept using artificial neural networks to calculate the variable lead times.
Author(s)
Sihn, W.
Pirron, J.
Schmidt, T.
Wiendahl, H.-H.
Mußbach-Winter, U.
Hauptwerk
Intelligent Systems and Control. Proceedings of the IASTED International Conference Intelligent Systems and Control
Konferenz
International Conference Intelligent Systems and Control 2000
Thumbnail Image
Language
English
google-scholar
Fraunhofer-Institut für Produktionstechnik und Automatisierung IPA
Tags
  • Production Planning a...

  • PPS

  • dynamisches System

  • artificial neural net...

  • Auftragsbearbeitung

  • Halbleiter

  • Fertigung

  • Fertigungsplanung

  • Fertigungssteuerung

  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Send Feedback
© 2022