Now showing 1 - 2 of 2
  • Publication
    Constraint production management using Fuzzy Control
    ( 1995)
    Mertins, K.
    ;
    Albrecht, R.
    ;
    Duttenhofer, F.
    The functions of short-time planning and control of orders on the factory's shop floor can be supported by Production Management Systems. A scheduling system capable of reflecting the planning staff's experience has been implemented. Due to the complexity of the scheduling problem and the typical lack of precision in shop expert's planning strategy descriptions a system was designed based on Fuzzy Logic. The article presents concepts, theory and implementation of a Fuzzy Logic scheduling system for an aluminium foundry and mill.
  • Publication
    Set-up scheduling by fuzzy logic
    ( 1994)
    Mertins, K.
    ;
    Albrecht, R.
    ;
    Wegener, U.
    ;
    Duttenhofer, F.
    Production Management Systems support the short-time planning and control of orders on the shop floor level in the factory. In order to support the planning staff a scheduling system was implemented reflecting most of the staff's experience. Because of the complexity of the scheduling problem and the unprecise descriptions of the planning strategy of the experts a system based on Fuzzy Logic scheduling system for an aluminium mill.