Fraunhofer-Gesellschaft

Publica

Hier finden Sie wissenschaftliche Publikationen aus den Fraunhofer-Instituten.

Hy Society- D5 Integrated System Analysis of a European Hydrogen Infrastructure Based on Different Scenarios. Scientific Report

Results of Work Package 2 (Task 2.2) of the HySociety Project. DG Energy and Transport Contract No. NNE5-2001-641
 
: Wietschel, Martin; Hasenauer, Ulrike
: European Hydrogen Society -HySociety-; Universidade Tecnica de Lisboa -UTL-, Instituto Superior Tecnico -IST-; Fraunhofer-Institut für Systemtechnik und Innovationsforschung -ISI-, Karlsruhe

:
Volltext urn:nbn:de:0011-n-336317 (1.2 MByte PDF)
MD5 Fingerprint: 7c6fe54d6767e9a62de141119b1e86f5
Erstellt am: 30.1.2008


Element named row_ProjectData has starweb_type Output Field Repeater but ID not found in STAR Web Designer.
Karlsruhe: Fraunhofer ISI, 2004, 74 S.
 
Englisch
Bericht, Elektronische Publikation
Fraunhofer ISI ()

[]
1 Scenario Analysis S.1
- 1.1 Introduction S.1
- 1.2 HySociety scenario framework S.1
- 1.2.1 General assumptions for scenario A and B S.1
- 1.2.2 Assumptions scenario A S.2
- 1.2.3 Assumptions scenario B S.3
- 1.2.4 Reference scenario S.4
- 1.3 Scenario analysis S.5
- 1.3.1 Calculation and characterisation of hydrogen production S.5
- 1.3.2 Country specific calculation and characterisation of hydrogen production S.8
- 1.3.2.1 Hydrogen from renewable energy sources S.8
- 1.3.2.2 Hydrogen from fossil fuels S.9
- 1.3.3 Quantitative characterisation of hydrogen infrastructure S.10
- 1.3.3.1 Hydrogen production, carbon sequestration and liquefaction plants S.10
- 1.3.3.2 Cryogenic trucks S.11
- 1.3.3.3 Pipelines S.11
- 1.3.3.4 Filling stations S.13
- 1.3.3.5 Summary S.13
- 1.3.4 Reduction of carbon emissions in scenario A and B S.14
- 1.3.5 Investment impact evaluation of scenario A and B S.17
- 1.4 Captive fleet vehicle analysis S.19
- 1.4.1 Results of captive fleet analysis S.22
- 1.5 Regional differentiation S.23
- 1.6 References Chapter 1 S.28
2 Technology Oriented Implementation Scenario's S.29
- 2.1 General scope of the Memo S.29
- 2.2 Blueprint S.30
- 2.3 Key changes S.35
- 2.3.1 Identification of the key changes S.35
- 2.3.2 Implementation strategies S.35
- 2.3.3 Targets, barriers and impacts S.40
- 2.4 Implementation scenarios S.42
- 2.4.1 Implementation scenario's to drive down fuel cell cost S.43
- 2.4.2 Implementation scenario's to build a pipeline infrastructure S.51
- 2.4.3 Implementation scenario's to create a refueling infrastructure S.61
- 2.5 Conclusion S.69
3 Annex S.71