Design and evaluation of a last-minute electricity market considering local grid limitations

 
: Grasenack, Martin; Jürgens, Lucas; Meißner, Anna Christin; Dreher, Alexander; Giron, Pedro; Knorr, Kasper; Vogt, Mike

:
Preprint urn:nbn:de:0011-n-6186097 (581 KByte PDF)
MD5 Fingerprint: 2ebc8d9bc44dc6465b4b2d36e634373d
© IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE.
Erstellt am: 5.1.2021


Institute of Electrical and Electronics Engineers -IEEE-; Institute of Electrical and Electronics Engineers -IEEE-, Power & Energy Society -PES-:
17th International Conference on the European Energy Market, EEM 2020 : 16-18 September 2019, Stockholm, Sweden, Online conference
Piscataway, NJ: IEEE, 2020
ISBN: 978-1-7281-6919-4
ISBN: 978-1-7281-6920-0
Paper 1161, 6 S.
International Conference on the European Energy Market (EEM) <17, 2020, Online>
Bundesministerium fur Wirtschaft und Energie BMWi (Deutschland)
SINTEG; 03SIN411; NEW 4.0
New 4.0 Norddeutsche Energiewende
Englisch
Konferenzbeitrag, Elektronische Publikation
Fraunhofer IEE ()
Fraunhofer ISIT ()
energy market; schedule deviations; fast local intraday market; Smart Market; Co-Simulation

Abstract
Schedule deviations have become a major issue in Germany's power system in recent years. This paper introduces a fast local intraday market design to address this problem. It shows the concept of a market clearing process for the 15- minute frame between the closing time of the intraday market and the time of delivery. This fast local intraday market shall reduce the schedule deviation of renewable energies and increase system stability. It also introduces a concept of considering grid limitations in the market process. Hence the grid sensitivities of the trading partners on the power grid are considered in the matching process. Therefore, a co-simulation which includes renewable energy providers, the system operator, the market component and flexibility providers is implemented. The results of the simulation show the predicted deviations in a 2025 scenario, the potential for flexibility, the reduction of the deviations and the expected costs.