• English
  • Deutsch
  • Log In
    Password Login
    Research Outputs
    Fundings & Projects
    Researchers
    Institutes
    Statistics
Repository logo
Fraunhofer-Gesellschaft
  1. Home
  2. Fraunhofer-Gesellschaft
  3. Konferenzschrift
  4. The self-sufficient solar house Freiburg - first results
 
  • Details
  • Full
Options
1993
Conference Paper
Title

The self-sufficient solar house Freiburg - first results

Abstract
The construction of the Self-Sufficient Solar House (SSSH) in Freiburg was completed in October 1992. Since that time the building is occupied by a 3 person family. The results of the first heating period indicate that the building performs as predicted in terms of its thermal behaviour. The construction of the building is without essential heat bridges. The opaque insulation performs as calculated. First measurements of the TI wall indicate an efficiency of 50 % for solar energy conversion. The operation of the roller blinds is without any failure. The air ventilation system has a heat recovery factor of 80 to 85 %. To our knowledge it is for the first time that a building in the Central European climate shows indoor temperatures above 18 degrees C during the whole heating period without any conventional backup heating system. The paper concentrates on the thermal behaviour of the building and the performance of the TI wall.
Author(s)
Stahl, W.
Voss, Karsten
Goetzberger, Adolf  
Mainwork
TI6. Sixth International Meeting on Transparent Insulation Technology. Proceedings  
Conference
International Meeting on Transparent Insulation Technology 1993  
Language
English
Fraunhofer-Institut für Solare Energiesysteme ISE  
  • Cookie settings
  • Imprint
  • Privacy policy
  • Api
  • Contact
© 2024